My WebLink
|
Help
|
About
|
Sign Out
Home
2013-05-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-05-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2013 4:28:20 PM
Creation date
5/23/2013 4:20:28 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/28/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment E <br />Pathway Master Buildout Plan <br />Lengt <br />Estimated Cost <br />Funding <br />Traffic <br />Description <br />h <br />Build Year <br />On Street <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />Retaining <br />Total <br />Score <br />(Miles) <br />Source <br />Counts <br />(Scorinq iDer 2008 Pathway Master Plan <br />wall <br />6 <br />County Road B2 <br />140.8 <br />Sidewalkfrom Lexington Avenue to Rice Street <br />2 <br />$942,000 <br />$330,000 <br />$127,200 <br />$1,399,200 <br />2013 -2015 <br />4,150 <br />17 <br />Victoria St (B to C) <br />129.3 <br />On -road and off -road pathway from County Road B <br />1 <br />$258,693 <br />$37,500 <br />$55,000 <br />$351,193 <br />2013 -2015 <br />4,825 <br />to County Road C <br />Constellation L <br />signage and striping along the route- construct <br />3 <br />$7,500 <br />$60,000 <br />$6,300 <br />$73,800 <br />2013 -2015 <br />NA <br />MacKubin Connection <br />Constellation E <br />signage and striping along the route <br />2.25 <br />$5,625 <br />$4,725 <br />$10,350 <br />2013 -2015 <br />NA <br />Constellation B <br />signage and striping along the route <br />1.6288 <br />$4,072 <br />$3,420 <br />$7,492 <br />2013 -2015 <br />NA <br />Contingency (11%) <br />easement/ testing etc. <br />$217,964 <br />Total <br />$2,060,000 <br />PROPOSED TO BE CONSTRUCTED AS A PART OF PARK RENEWAL PROGRAM <br />On -road and off -road pathways between Roselawn <br />Done: 2011- <br />12 <br />Fairview Ave (South of B2) <br />133 <br />Avenue and County Road B -2 <br />2012 <br />On -road and off -road pathways between County <br />Fairview Ave (B2to C) <br />Road B2 and County Road C <br />Done: 2012 <br />21 <br />Rice St. (Co Rd B to Cc Rd B2) <br />Done: 2011 <br />19 <br />Dale St North of Cc Rd C <br />73.75 <br />Off- street trail from S Owasso Blvd to County Road C <br />Done: 2011 <br />22 <br />Brenner to Langton Connection <br />61.5 <br />Pathway connection between Brenner Ave and <br />Done: 2011 <br />Langton Lake Park <br />
The URL can be used to link to this page
Your browser does not support the video tag.