My WebLink
|
Help
|
About
|
Sign Out
Home
2013-05-28_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2013
>
2013-05-28_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2013 4:28:20 PM
Creation date
5/23/2013 4:20:28 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
5/28/2013
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pathway Master Buildout Plan <br />Lengt <br />Estimated Cost <br />Funding <br />Traffic <br />Description <br />h <br />Build Year <br />On Street <br />Signage <br />Off Road <br />Bridge <br />Striping <br />Drainage <br />Retaining <br />Total <br />Score <br />(Miles) <br />Source <br />Counts <br />(Scoring per 2008 Pathway Master Plan <br />wall <br />SEGMENTS WITH SCORES LESS THAN 100 <br />Pathway connection that creates a link between the <br />31 <br />Millwood to County Road C2 Link <br />98.5 <br />corner of Millwood and Chatsworth through the <br />2013 -2015 <br />NA <br />Ramsey County open space to County Road C2 <br />34 <br />Alta Vista Drive <br />94.25 <br />Pathway connection along Alta Vista Drive between <br />Future <br />Unknown <br />Larpenteur Avenue and Reservoir Woods Park <br />1 <br />County Road D <br />93.75 <br />On and off road between Cleveland and Fairview <br />Future <br />8,400 <br />Avenue <br />10 <br />Cleveland Ave <br />92.75 <br />On and off road, between County Road C and <br />Future <br />6,700 <br />County Road D <br />9 <br />Larpenteur Ave <br />92.5 <br />An off -road trail from Reservoir Woods to Galtier <br />Future <br />12,800 <br />Street <br />33 <br />Cohansey St to HANC Connection <br />89.5 <br />Pathway connection between Cohansey Street and <br />Future <br />NA <br />HANC <br />30 <br />Villa Park Connections <br />88.75 <br />Pathway connection from Shryer Ave and from Ryan <br />Future <br />NA <br />Ave into Villa Park <br />On and off road pathways from the west City <br />2 <br />County Road C2 (W of Snelling) <br />87 <br />Boundary to Snelling Avenue This corridor would <br />Future <br />2,300 <br />include a grade separated crossing of 35W <br />3 <br />County Road C2 (E of Snelling) <br />86 <br />On and off road pathways from the Snelling Avenue <br />Future <br />2,350 <br />to Victoria Street <br />29 <br />Lovell to Minnesota Connection <br />80.25 <br />Pathway connection between Lovell Ave and <br />Future <br />NA <br />Minnesota Street <br />Pathway connection between S Owasso Blvd and <br />27 <br />Heinel Drive Connection <br />75.5 <br />County Road C along Heinel Drive <br />Future <br />NA <br />28 <br />Judith to Iona Connection <br />72.75 <br />Pathway connection between Judith Ave and Iona <br />Future <br />NA <br />Lane <br />23 <br />Langton Lake Loop <br />72.5 <br />Pathway that goes around all of Langton Lake <br />Future <br />NA <br />On and off road facilities as a part of public street <br />infrastructure project within Twin Lakes <br />24 <br />Twin Lakes Redevelopment Area Connections <br />56.75 <br />Redevelopment area (between Fairview and <br />Future <br />NA <br />Cleveland) Provide connection from the <br />redevelopment area into Langton Lake Park <br />32 <br />Eustis to St Croix Connection <br />49 <br />Pathway connection between Eustis Street and St <br />Future <br />NA <br />Croix Street <br />
The URL can be used to link to this page
Your browser does not support the video tag.