Laserfiche WebLink
l�t <br />k�-' ' <br />nt i" <br />-.. <br />� <br />Degenaar Construction, Inc. <br />4091 154th Court West, Rosemount, MN 55068 <br />Rick 952-797-4205 <br />Michelle & Chris Grimes —1741 Stanbri <br />24 x 38 ADDITION <br />Ave. Roseville MN <br />Foundation--- foundation will be 24x38 full basement, entry will be 10 z10 with a <br />Crawl space. �' <br />Structure--- All outside walls will be of 2 x 6 construction, the roof pitch will be <br />Matched up to the existing slope with pre- manufactured trusses if <br />Possible. All siding and shingles will be matched up as close as possible. <br />If existing shingles are old I would recommend a total s6ingle <br />Replacement. AIl interior walls will be of 2 g 4 constructions. <br />_. _ __ <br />Windows --- there will be a total of 4 windows,;l sliding paho�door and 1 front door <br />With a sidelight window. These will all be low-e gas flled vinyl. <br />Flooring--- I figured for vinyl flooring in all three bathrooms, and dinning area of <br />The new addition, I did not figure id for the ezisting kitchen area. <br />Plumbin <br />.��� '�� <br />`� i���`�`�t5 <br />�, . ,.. <br />�, ��. <br />Living room, bedroom, closet, aad hallway will be a carpet with a value <br />Of about $ 32.00 a ard installed. <br />, 2 ast iron white tubs, three elongated white toitets,l one piece 5 foo� <br />� Fiberglass shower stall with 2 shower heads. A custom ma d e s h o w e r <br />Door for both the shower, and the tub in the main bath. A white ped. <br />Sink for the half bath. The master bath will get a 54 inch vanity with a�, <br />Cultured marble top, the main bath will get a vanity about 36 inches <br />With a cultured marble top. The master bath will get a custom made <br />Mirror. while the half baih would look best with an oval shaned. <br />Heating & ac.--- The ezisting furnace and air conditioning will be replaced with a <br />New unit sized for the house. I figured in an 80% furnace, <br />However if vou would like to uugrade to a 90% we can. <br />Electrical--- A new 150 amp panel will aeed to be installed, all wir�a-ing will be done <br />Code unless vou indicate somethin� vou want different. <br />1. <br />Notes---- All work will be done in a professional and timely mater during regular <br />Business hours. The job will be picked up each day and kept clean. <br />This iob should take about 6 to 8 weeks to comolete. <br />Total-----------------------------------------------------------------------$ <br />��Fr % <br />� y� <br />,� -�.a���� � ����,�,�,�� � �����,r� 1 �-�->>��� , � <br />'�r . . <br />�' 1,�:7 � n� ��� �. �� t'.�-�s l.0 � n da:�. uS ,,r,,��. <br />u <br />C=�� �pl�� z, �.��,�.,�,�- t-�- 5 <br />,.�. <br />�►�'1���� I "�b <br />� a-,��y �. <br />