My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-013
Roseville
>
Planning Files
>
2007
>
pf07-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 3:18:05 PM
Creation date
6/14/2013 1:51:52 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-013
Planning Files - Type
Interim Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
—. — <br />i inspecting another crushing operation at the former Ramsey County Public Works site <br />_ (located at Rice Street and I-694) prior to this May 3`a hearing. The illustration above <br />includes a dashed circle (in black text) showing a 150-foot boundary surrounding the site <br />of the proposed crushing operation. <br />7.0 STAFF RECOMMENDATION <br />�� 7.1 Based in the comments and findings in sections 4 and 5 of this report and the minutes of <br />- the March 7, 2007 Planning Commission meeting, the Planning Division recommends <br />� approval of the requested INTERIM USE PERMIT for a temporary asphalt/concrete <br />�� recycling operation at 515 Larpenteur Avenue, subject to the following conditions: <br />i�� a The temporary use shall be limited to the crushing/recycling of materials that are <br />i i cunently stockpiled on the subject property. <br />�, b The temporary operation shall employ "best management practices" (e.g., <br />�� watering piles, installing silt fencing, etc.) to control dust and potential stockpile <br />i� erosion in the event of a rain storm — said erosion control plan must be reviewed <br />i� and approved by the City Engineer. <br />�!� c Hours of the crushing/recycling operation, including hauling and stockpiling, <br />�- shall be limited to weekdays from 7:00 a.m. to 6:00 p.m. <br />i� d Written notices shall be sent to property owners within the postcard (i.e., <br />i�i Roseville's public hearing notice) distribution area one week prior to crushing so <br />��� that they may plan accordingly. Addresses will be provided to the applicant. <br />� i e The INTERIM USE PERMIT shall be valid for a period of one week, beginning <br />„ with the commencement of crushing activity, which must be completed by May <br />,; 31, 2007. If Ramsey County is unable to begin the recycling operation in time to <br />,� finish before the May 31, 2007 deadline, the recycling operation may take place <br />_ over a one-week period between November 1, 2007 and December l, 2007. <br />'�� f The recycled material shall be removed from the site within one year of the <br />�� completion of the recycling operation. <br />,� 8.0 SUGGESTED C1TY COUNCIL ACTION <br />,�> 8.1 ADOPT A RESOLUTION approving the Ramsey County request for an INTERIM USE <br />;i� PERMIT to establish a temporary concrete and asphalt recycling operation on the 18-acre <br />; � parcel at Larpenteur Avenue and Kent Street (northeast corner), based on the comments <br />_ of Section 6 and the conditions of Section 7 of the project report dated March 26, 2007. <br />Prepared by: Associate Planner Bryan Lloyd (651-792-7073) <br />Attachments: A: Area map <br />B: Aerial photograph <br />C: Applicant narrative <br />D: Proposed site plan <br />E: Draft minu[es from the March 3, 2007 Planning Commission meeting <br />F: Draft resolution <br />PF07-013 RCA 032607 <br />Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.