My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-006
Roseville
>
Planning Files
>
2007
>
pf07-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 4:07:07 PM
Creation date
6/14/2013 2:28:08 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-006
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� • <br />portion of the cost may be attributable to United Properties as a necessity to the senior coop <br />development, the majority of the cost is due to the need to separate this road from the coop's <br />parking lot and the construction of the road as a public street versus private service drive. We <br />estimate the total public road to be approximately 1,100 feet in length. Excluding any lighting as <br />well as costs associated with treating water runoff, we would be looking at costs of approximately <br />$200 per linear foot for a 24' wide road. Approximately 600 linear feet of this road was not <br />contemplated in our earlier plan since it was not going to be a public road. The $120,000 <br />associated with this 600 feet of public road does not even take into account the additional costs to <br />build the balance of this road to meet public road standards, additional requirements such as street <br />lighting, the pedestrian path contemplated within our site from the Brenner Avenue Easement to <br />Langton Lake Park, or the loss of revenue noted earlier resulting from the elimination of the town <br />homes. Connection to the Park was specifically planned by the City and identified as an <br />important goal for fulfilling Park needs. While the City Ordinance excludes utiliry and right-of- <br />way improvements from the Park Fee Calculation, it does not exclude road access. We therefore <br />feel very strongly that the cost of the Park access road that is not attributable to necessary site <br />improvements should be counted against any required Park Dedication Fee. In this case, the road <br />cost, pedestrian paths within our site that are accessible to the public, lighting, and the proposed <br />construction of paths around the southern wetland area, should be subtracted from the $190,000 <br />total Park Fee likely to be assessed. We feel these costs in total negate this fee in its entirety. It is <br />our understanding that the Park and Recreation Commission voted for the fee assessment, so we <br />would like the appropriate City entity (City Council?) to reconsider this issue as part of the Final <br />Plan Approval. <br />It is our assumption that we will be constructing public improvements (the public road and <br />pedestrian paths) within our site only. Any connection through the Brenner Avenue Easement <br />and the extension of the road into the City-owned land to the south of our parcel including the <br />proposed "turn around" and connection to the existing Park parking lot will not be the <br />responsibility of United Properties. <br />In summary, we look forward to adding a second Applewood Pointe Community in Roseville. <br />The previous community has been a tremendous success — both for United Properties and the City <br />of Roseville. Many of our residents have come from within Roseville and we are confident that <br />providing this type of housing opportunity will continue to free up existing homes for younger <br />buyers. We have enjoyed a great working relationship with the City, and look forward to <br />breaking ground on this community as soon as possible. <br />AH/bls <br />
The URL can be used to link to this page
Your browser does not support the video tag.