My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-006
Roseville
>
Planning Files
>
2007
>
pf07-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 4:07:07 PM
Creation date
6/14/2013 2:28:08 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-006
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
345
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� � <br />� <br />THE TRAFfIC STUDY COMPANY <br />Memorandum <br />• <br />To: Alex Hall, United Properties <br />From: Mike Spack, P.E. <br />Date: 5/29/2007 <br />Re: Traffic Generation for Proposed Applewood Pointe - Roseville, MN <br />United Properties is proposing a 93 unit, senior co-operative development <br />(Applewood Pointe) east of Cleveland Avenue and south of Brenner Avenue in <br />Roseville, MN. The development will have primary access on the west side of the <br />development from a proposed driveway on Cleveland Avenue. Secondary access <br />will be provided on the southeast portion of the development through the existing <br />industrial development immediately south of the proposed development. The <br />purpose of this memo is to determine if there will be any negative traffic impacts <br />caused by this development. <br />A trip generation analysis was performed for the site based on the methods and <br />rates publisMed in the ITE Trip Generation Manual, 7th Edition, which is a <br />compilation of traffic data from existing developments. The results are shown in <br />Table 1. <br />Table 1— Vehicles Enterinq/Exitinq Pro <br />ITE Land <br />Use Code Description <br />252 Attached Senior Adult Housing <br />(93 dwellinq units) <br />osed Develo ment <br />Daily AM Peak PM Peak <br />Tri s Hour 7ri s Hour Tri s <br />In Out In Out In Out <br />162 I 162 I 3 I 4 I 6 I 4 <br />Approximately 160 vehicles will enter and exit the site over the course of a typical <br />day. The data for senior housing in the ITE Trip Generation Manual shows little <br />traffic is generated in the morning and evening rush hours. The traffic generated <br />by the proposed development is low enough that it will not negatively impact the <br />operations of the adjacent roadway network. No improvements are needed to <br />accommodate traffic from the development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.