My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-021
Roseville
>
Planning Files
>
2007
>
pf07-021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 3:07:05 PM
Creation date
6/17/2013 3:07:54 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-021
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� f • <br />Duane Schwartz, P.E. <br />City of Roseville <br />LJ <br />June 25, 2007 <br />Page 2 <br />3. Estimate the new total trips that will be generated in the a.m. and p.m. peak hours <br />and on a daily basis by the proposed hotel development and all potential adjacent <br />developments, based on current ITE trip generation rates. <br />4. Distribute and assign the a.m. and p.m. peak hour trips generated by the proposed <br />hotel development and all potential adjacent developments to the existing <br />roadway system and street intersections. <br />5. Analyze a.m. and p.m. peak hour intersection operatioi�.s at the key intersections <br />listed in Task #1 for future build (one year after construction) and year 2030 <br />condiHons. Please note that the year 2030 condition analysis will take into account <br />the potential AUAR developments and roadway modifications in this area, and <br />that the analysis review will only be of the p.m. peak hour. <br />6. Determine what improvements, if any, are needed to accommodate the proposed <br />development with acceptable levels of service. <br />7. Review the site access, as well as any other related ulternal or site specific traffic <br />issues and make recommendations necessary to alleviate noted issues. <br />8. Prepare a draft memorandum describing the results of the traffic analysis and any <br />recommendations. <br />9. Make revisions as appropriate based on City review and prepare a final <br />memorandum. <br />10. Optional task - Prepare for and attend two meetings regarding this project. One to <br />address comments/concerns of the applicant and the other to address the City <br />Council regarding this proposal. <br />BASIS OF PAYMENT <br />The total cost of our services on this project is estimated at $6,500. This cost is <br />independent of the optional task listed, which is estimated at $1,000. The total cost <br />including the optional task is then estimated at $7,500. The cost is based on the scope of <br />services provided. It is understood that if the scope or the extent of work is adjusted at <br />any time, the project cost will be adjusted accordingly, upon your approval. <br />We propose to be reimbursed for our services on an hourly basis at the approved City <br />rates for actual time expended. The project cost includes out-of-pocket expenses <br />(printing, reproduction, etc.), billed at cost, and mileage, which will be billed at a rate <br />not to exceed the IRS allowance for business miles. Invoices would be submitted on a <br />monthly basis for work performed during the previous month, with payment due <br />within 30 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.