My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-035
Roseville
>
Planning Files
>
2007
>
pf07-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2014 4:06:35 PM
Creation date
6/17/2013 3:24:56 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-035
Planning Files - Type
Variance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 BACKGROUND: <br />� 4.1 On January 9, 2006, the City Council approved the REZONING of the former Franks site <br />_ to Retail Business District (B-2). The conceptual site plan submitted during this process <br />t included remodeling the former 18,480 sq. ft. structure; constructing an 8,000 sq. ft. <br />� eastern addition; and the development of a bank on the northern portion of the parcel. <br />�, <br />� 4.2 Recently, permits have been issued for the remodeling of the former building into a <br />s Golfsmith Golf and Tennis and the site is undergoing the installation of storm water <br />�� management devices and other site preparation improvement for future projects. One <br />� o such project is the 7,800 sq. ft. M& I Bank which is anticipated to begin construction <br />� � Spring 2007. <br />�� <br />i� 4.3 Recently the City Planner met with representatives of Kimco Realty and RLK Inc. to <br />�� review a proposal to reduce the size of the eastern building addition and to construct a <br />�� stand-alone Starbucks Coffee between the existing Franks building and Fairview Avenue. <br />l�� 4.4 The City Planner's initial review concluded that the specific use (cafe under the City <br />� � Code) was a permitted use and that a drive-thru would require a CONDITIONAL USE <br />� s PERMIT. Further, it was concluded that the proposed site layout met all applicable <br />��� setback requirements, however the City Planner indicated a need to revisit the previous <br />�o traffic study to determine whether additional modifications/changes were necessary. <br />,� <br />�= PROPOSAL REVIEW: <br />�> 4.5 The specific proposal seeks to construct a single story, 2,018 sq. ft cafe/coffee shop <br />�-t between the existing building and the property line adjacent to Fairview Avenue. Access <br />�� to the site would come from the existing site access off of Fairview Avenue (directly <br />��> south) and the relocated access off the frontage road currently under construction. <br />,� <br />?s 4.6 The proposal indicates a reconfigured parking lot on both sides of the former Frank's <br />?�� building, as well as parking provided adjacent to the Starbucks building. The proposal <br />;o includes a landscape plan and detached trash enclosure located near the southwest corner <br />� � of the site. <br />,� <br />3� 4.7 The revised development proposal will require an amended drainage plan/permit from the <br />;-� Rice Creek Watershed as well an approval from the Roseville City Engineer. Please note <br />>> that the proposed site modification will require few changes to previously approved plans. <br />: �, <br />� � 4.8 The proposed elevations for the new structure are consistent with § 1010 (Design <br />� s Standards) of the City Code and include a mixture of brick, rock-faced masonry block <br />><� and EIFS; aluminum door and window frames; metal flashing; and a flat roof. <br />-�o <br />ai <br />�� <br />�� <br />PF07-009_RCA_022607.doc Page 2 of 6 <br />-� <br />
The URL can be used to link to this page
Your browser does not support the video tag.