Laserfiche WebLink
� <br />� <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 11/2/2007 <br />Offset: 83 (50%), Referenced to phase 2:NBT and 6:SBT, Start of 1 st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.84 <br />Intersection Signal Delay: 41.9 Intersection LOS: D <br />Inte�section Capacity Utilization 83.5% ICU Level of Service E <br />Analysis Period (min) 15 <br />its and Phases: 4: CO RD B& SNELLING AVE <br />m1 I 1 02 I� 03 I m4 <br />� v6 � 05 I� m7 �' a�8 <br />T:119591011Synchro12009_Build PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />