Laserfiche WebLink
�. <br />� <br />''\ <br />Lanes, Volumes, Timings - <br />5: HARMAR & SNELLING AVE 11/2/2007 <br />Actuated Cycle Length: 165 <br />Offset: 64 (39%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.75 <br />Intersection Signal Delay: 20.6 Intersection LOS: C <br />Intersection Capacity Utilization 73.4% ICU Level of Service D <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signal, <br />and Phases: 5: HARMAR & SNELLING AVE <br />r ml I o2 04 <br />23 s 109 s 33 s <br />• 06 � m5 � 08 <br />T:11959\011SynchrolExisting PM Peak Hour.syn <br />Synchro 7 - Report <br />Page 2 <br />