Laserfiche WebLink
'� <br />� <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 11/212007 <br />Offset: 86 (72%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.91 <br />Intersection Signal Delay: 36.9 Intersection LOS: D <br />Intersection Capacity Utilization 88.1% ICU Level of Service E <br />Analysis Period (min) 15 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />and Phases: 4: CO RD B& SNELLING AVE <br />e2 <br />05 I i e6 <br />ml <br />T:119591011Synchro\Existing SAT Peak Hour.syn Synchro 7- Report <br />Page 2 <br />