Laserfiche WebLink
� <br />� <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 11/2/2007 <br />Actuated Cycle Length: 120 <br />Offset: 78 (65%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coortlinated <br />Maximum v/c Ratio: 0.87 <br />Intersection Signal Delay: 26.6 Intersection LOS: C <br />Intersection Capacity Utilization 79.3% ICU Level of Service D <br />Analysis Period (min) 15 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />and Phases: 5: HARMAR & SNELLING AVE <br />ol <br />05 <br />T:119591011Synchro\Existing_Adjusted SAT Peak Hour.syn Synchro 7- Report <br />Page 2 <br />