Laserfiche WebLink
� <br />� <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 11/2/2007 <br />Actuated Cycle Length: 120 <br />Offset: 78 (65%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.77 <br />Intersection Signal Delay: 24.1 Intersection LOS: C <br />Intersection Capacity Utilization 68.7% ICU Level of Service C <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signal. <br />T:119591011Synchro12009_No-Build SAT Peak Hour.syn Synchro 7- Report <br />Page 2 <br />