Laserfiche WebLink
', <br />� <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 1112/2007 <br />Actuated Cycle Length: 120 <br />Offset: 78 (65%), Referenced to phase 2:NBT and 6:SBT, Start of 1 st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.83 <br />Intersection Signal Delay: 26.2 Intersection LOS: C <br />Intersection Capacity Utilization 7.1.9% ICU Level of Service C <br />Analysis Period (min)15 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />T:11959101\Synchro12009_Build SAT Peak Hour.syn Synchro 7- Report <br />Page 2 <br />