My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-053
Roseville
>
Planning Files
>
2007
>
pf07-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 4:28:31 PM
Creation date
6/17/2013 3:39:18 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-053
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />54 <br />55 <br />56 <br />-� �-. <br />Further discussion ensued regarding traffic flow within the site, and ingress and <br />egress impacts; recognizing that both proposed phases for the property affect <br />different residential properties, and separate review allowed for better consideration of <br />each project on those specific neighborhoods; buffering on the east side to protect the <br />residential neighborhood, including multi-family units, through installation of a six foot <br />(6') wooden fence; efficiencies with 90-degree parking configuration, and future plans <br />to make the entire parking lot contiguous over time; and proposed improvements for <br />drainage and current water buildup at specific intersections (County Road B closest to <br />residential area on the east) <br />Megan Sunday? advised that drainage was being addressed through installation of <br />hvo (2) proposed catch basins to carry surface water to the underground system from <br />that specific intersection. <br />Additional discussion included current practice of illegal snow storage on the property <br />adjacent to the apartment building on the east side, and capacity of the underground <br />tanks to handle snow melt conditions. <br />The applicanYs engineer and Ms. Bloom both addressed drainage issues, with Ms. <br />Bloom reviewing the overall area, pre-existing conditions; and ongoing work in <br />redeveloping the entire drainage area (through recent improvements at Target and <br />Cub Foods), thereby reducing peaks, and revised storm water drainage regulations <br />from initial construction of the Mall. <br />Denny Swanson advised that he would work with the civil engineer and architect <br />regarding the current ponding issues, and work together to alleviate it. Mr. Swanson <br />further noted that long-term snow storage would no long take place on the lot, but that <br />it would be held in temporary piles for a maximum of 48 hours and then melted with <br />portable equipment over the manholes leading into the drainage system. <br />Chair Bakeman advised that the applicant needed to be aware of the City's recent <br />Sign Ordinance and Master Plan for signs to ensure their compliance with the <br />proposed improvements. <br />Mr. Swanson assured Commissioners that he would review the Ordinance for <br />compliance and update his records accordingly. <br />Further discussion included the proposed restaurant use, without identifying the client; <br />Internal traffic flow issues; the applicanYs attempt, since their purchase of the property <br />in February of 2007, to improve a 4-sided strip mall constructed in 1963 and make it <br />viable in today's market; Commissioner's suggestion to the applicant for anchor <br />tenants to pro-actively develop an overall traffic plan to improve safety and access <br />capabilities for the best interests of tfieir patrons; existence of a ring road at the <br />Center, and potential efficiencies as improvements continue; and suggestions that the <br />applicant work with other agencies (i.e., Mn/DOT, Ramsey County, Metropolitan <br />Transit, and the City) to make the site more pedestrian friendly, safer, and to address <br />other associated issues to improve the overall site. <br />Discussion ensued, with other comments related to the green area setback <br />requirements dictated along Snelling Avenue; improved mass transit options to and <br />within the site; improved monitoring of the owners of debris on site and impacting <br />adjacent properties; hours of operation for snow removal and/or melting equipment <br />and impacts on adjacent residential properties; and verification through the Building <br />Permit application process that no environmental issues exist on the Firestone site <br />through soil testing. <br />Public Comment <br />
The URL can be used to link to this page
Your browser does not support the video tag.