Laserfiche WebLink
--. <br />� <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 9/12/2007 <br />Actuated Cycle Length: 165 <br />Offset: 64 (39%), Referenced to phase 2:NBT and 6:SBT, Start o# 1 st Green �,,, ,,^� _, ,;. ; <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.75 �;,, � � <br />��. �,..�.�. .... _,. <br />Intersection Signal Delay: 20.6 Intersection LOS: C <br />: ., ; <br />,,. <br />Intersection Capacity Utilization 73.4% !CU Level of Service D . <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signal. <br />and Phases: 5: HARMAR & SNELLING AVE <br />m1 I I o2 I"'' m4 <br />1 ms <br />T:11959101\Synchro\Existing PM Peak Hour.syn <br />05 1--� 0s <br />Synchro 7 - Report <br />Page 2 <br />