Laserfiche WebLink
--� <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 9/12/2007 <br />Offset: 83 (50%), Referenced to phase 2:NBT and 6:SBT, Start of 1 st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.99 <br />lntersection Signal Delay: 52.5 Intersection LOS: D <br />Intersection Capacity Utilization 97.9% ICU Level of Service F <br />Analysis Periad (min)15 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shovm is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signaL <br />� � °� � �� <br />, `��.� .,�,� ,,, ,,,,, .. � ,r., <br />T:\1959\01\Synchro\2009_No-Build PM Peak Hour.syn <br />Synchro 7 - Report <br />Page 2 <br />