Laserfiche WebLink
� � <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 9/12/2007 <br />Actuated Cycle Length: 165 <br />Offset: 64 {39°f); Referenced to phase 2:NBT and 6:SBT, S#art of 1s# Green ,,, ' ,� ., a..,. ,. ,; „,' <br />Control Type: Actuated-Coordinated �� <br />Maximum v/c Ratio: 0.82 �'; ' � �'�'. , '� ���� ' <br />, x, � ��.� ,. . �, <br />Intersection Signal Delay: 26.8 Intersection LOS: C <br />Intersection Capacity Utilization 78.6% ICU �eve( of Service D ` 3 <br />�.,, r �. ,,,_.., � .��,�,`: ,r ,.,"�., ,»,,,,�,,..,.,. ,. <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signaL <br />and Phases: 5: HARMAR & SNELLING AVE <br />T:\1959\01\Synchro12009_No-Build PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />