Laserfiche WebLink
'� <br />0 <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 9/12/2007 <br />Offset: 83 (50%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated � r�r_ � �_ � r,. ,��, <br />,�_r.�����.���.��.� �_ <br />Maximum v/c Ratio: 1.02 <br />Intersec6on Signal Delay: 53.5 ����' intersection LOS: D `"�a �� � x�"" <br />Intersection Capacity Utilization 98.2% ICU Level of Service F <br />Analysis Period (min)15 , <br />- Volume exceeds capacity, queue is theoretically infinite. <br />Queue shown is maximum after two cycles. ` x�` �� <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />s..,. -:�� ,�� ��,a� ,����,-� <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />T:11959\01\Synchro\2009_Build PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />