Laserfiche WebLink
--. <br />0 <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 9/12/2007 <br />Actuated Cycle Length: 165 <br />Offset: 64 (39%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green �= �, -._ <�. - �,��;,;�,��,,.�� <br />Control Type: Actuated-Coordinated <br />Maximum vJc Ratio: 0.81 � q <br />,�, - . <br />Intersection Signal Delay: 26.1 Intersection LOS: C <br />Intersection Capacity Utilization 78.2% ICU Level of Service D _ � <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signaL <br />5: HARMAR & SNELLING AVE <br />T:11959\01\Synchro�2009_Build PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />