Laserfiche WebLink
� <br />0 <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 9112J2007 <br />Actuated Cycle Length: 120 <br />Offset: 78 (65%), Referenced to phase 2:NBT and 6:SBT, Start of 1 st Green ;, ___ , j ,,� _, : <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 0.69 ;� �" � �� - <br />„ ,�K.� .; �� u,,._ . .. . . ' <br />Intersection Signal Delay: 18.5 Intersection LOS: B <br />Intersection Capacity Utilization 68.4% '", ICU Level of Service C ,,, ���;���� ,,,, �'`�� 3x' ' <br />. . u,,,,;, , , ,,, ,,, ,; , „ „ . <br />Analysis Period (min) 15 <br />m Volume for 95th percentile queue is metered by upstream signaL <br />and Phases: 5: HARMAR & SNELLING AVE <br />m2 <br />T:11959\01 \Synchro\Existing SAT Peak Hour.syn Synchro 7- Report <br />Page 2 <br />