Laserfiche WebLink
-� <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE <br />Offset: 86 (72%), Referenced to phase 2:NBT and 6:SBT, Start of 1 st Green <br />Control Type: Actuated-Coordinated �;� �� �� <br />Maximum v/c Ratio: 0.97 <br />Intersection Signal Delay: 38.8 `� Intersection LOS: D <br />Intersection Capacity Utilization 91.3% ICU Level of Service F <br />Analysis Period (min)15 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />and Phases: 4: CO RD B 8� SNELLING AVE <br />01 <br />m5 1 ms <br />9/12/2007 <br />� ° ' `��������� <br />, <br />,.. <br />. � .�, �.... F ... .... : ......�„ , ��� , ..� <br />m3 I m4 <br />� m� I---► ms <br />T:\1959\01\Synchro�2009_No-Build SAT Peak Hour.syn <br />Synchro 7 - Report <br />Page 2 <br />