Laserfiche WebLink
-� -- <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 9/12/2007 <br />Actuated Cycle Length: 120 <br />C?ffset: 78 (65°la), Referenced to phase 2;NBT and 6:SBT, Star� of �st Green <br />Control Type: Actuated-Coordinated <br />� � <br />Maximum �rlc Ratio: 0.83' � � � , -..., .� � :a ,����;� ������ .�-�.��� <br />Intersection Signal Delay: 25.7 Intersection LOS: C <br />Intersection Capacity Utilization 78.0°(0 �. ICU Level of SeNice D' , !,,,���� ,"�ve, ,,,,,,,,; <br />Analysis Period (min) 15 <br /># 95th percentile volume exceeds capacity, queue may be lot►ger. <br />Queue shown is maximum after two cycles. <br />„�„ ,,, �� �_� <br />m Volume,for 95th percentile queue is metered by upstream signaL <br />5: HARMAR & SNELLING AVE <br />T:\1959\011Synchro\2009_No-Build SAT Peak Hour.syn Synchro 7- Report <br />Page 2 <br />