Laserfiche WebLink
-.. — <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 9/12/2007 <br />Offset: 86 (72%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control'Type: Actuated-Coordinated , <br />Maximum v/c Ratio: 0.98 <br />Intersection Signal Delay: 41.1 Interseciion LOS: D` �;,i <br />Intersection Capacity Utilization 93.1 % ICU Level of Service F <br />Analysis Period (min)15 ' " <br />,. � _ .._ s ..,. � � _.._.,,, . ,. <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shown is maximum after two cyc{es. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />and Phases: 4: CO RD B& SNELLING AVE <br />m2 <br />m6 <br />01 I' m3 I' 04 <br />r" m7 �- <br />T:\1959\01\Synchro�2009_Build SAT Peak Hour.syn Synchro 7- Report <br />Page 2 <br />