My WebLink
|
Help
|
About
|
Sign Out
Home
pf07-053
Roseville
>
Planning Files
>
2007
>
pf07-053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 4:28:31 PM
Creation date
6/17/2013 3:39:18 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
07-053
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
322
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />0 <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 9/12/2007 <br />Actuated Cycle Length: 120 <br />Offset: 78 (65%)> Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated <br />Maximum vlc Ratio: 0.87 <br />Intersection Signal Delay: 26.6 Intersection LOS: C <br />Intersection Capacity U6lization 79.0% ICU Level of Service D , <br />Analysis Period (min) 15 <br /># 95th percentile volume exceeds capacity, queue may be longer. " <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. ��� �� ���' � �"� "����� <br />and Phases: 5: HARMAR 8 SNELLING AVE <br />e2 <br />05 <br />ml <br />04 <br />08 <br />T:11959\01\Synchro12009_Build SAT Peak Hour.syn <br />Synchro 7 - Report <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.