Laserfiche WebLink
� <br />0 <br />Lanes, Volumes, Timings <br />5: HARMAR & SNELLING AVE 9/12/2007 <br />Actuated Cycle Length: 120 <br />Offset: 78 (65%)> Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated <br />Maximum vlc Ratio: 0.87 <br />Intersection Signal Delay: 26.6 Intersection LOS: C <br />Intersection Capacity U6lization 79.0% ICU Level of Service D , <br />Analysis Period (min) 15 <br /># 95th percentile volume exceeds capacity, queue may be longer. " <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. ��� �� ���' � �"� "����� <br />and Phases: 5: HARMAR 8 SNELLING AVE <br />e2 <br />05 <br />ml <br />04 <br />08 <br />T:11959\01\Synchro12009_Build SAT Peak Hour.syn <br />Synchro 7 - Report <br />Page 2 <br />