Laserfiche WebLink
'� <br />'"1 <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 1112(2007 <br />Offset: 83 (50%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated <br />Maximum vlc Ratio: 0.96 <br />Intersection Signal Delay: 51.5 Intersection LOS: D <br />Intersection Capacity Utilization 95.8% ICU Level of Service F <br />Analysis Period (min) 15 <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shown is maximum after two cycles. <br />and Phases: 4: CO RD B& SNELLING AVE <br />01 I I 02 <br />¢�6 <br />�: <br />05 I� m7 I� m8 <br />T:119591011Synchro\Existing PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />