Laserfiche WebLink
� ^ <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 11/2/2007 <br />Offset: 83 (50%), Referenced to phase 2:NBT and 6:SBT, Start of 1st Green <br />Control Type: Actuated-Coordinated <br />Maximum v/c Ratio: 1.02 <br />Intersection Signal Delay: 53.0 Intersection LOS: D <br />Intersection Capacity Utilization 98.2% ICU Level of Service F <br />Analysis Period (min) 15 <br />— Volume exceeds capacity, queue is theoretically infinite. <br />Queue shown is maximum after two cycles. <br /># 95th percentile volume exceeds capacity, queue may be longer. <br />Queue shown is maximum after two cycles. <br />m Volume for 95th percentile queue is metered by upstream signal. <br />and Phases: 4: CO RD B& SNELLING AVE <br />�� s av s 14 . 4L s <br />1 06 � 05 # m7 "'M` m8 <br />� <br />� <br />T:119591011SynchrolExisting_Adjusted PM Peak Hour.syn Synchro 7- Report <br />Page 2 <br />