Laserfiche WebLink
►. <br />� <br />.�_ <br />Lanes, Volumes, Timings <br />4: CO RD B& SNELLING AVE 11I212oo7 <br />Offset: 83 (50%). Referenced to phase 2:N8T and 6:SBT <br />Control Type: Actuated-Coordinated <br />Maximum vlc Ratio: 0.83 <br />Intersection Signal Delay: 41.6 <br />Intersection Capacity Utilization 82.8% <br />Analysis Period (min) 15 <br />Start of 1st Green <br />Intersection LOS, D <br />ICU Level of Service E <br />� <br />t <br />T:11 9 5 91011Synchro12009_No-8uild PM Peak Houcsyn <br />Synchro 7 - Report <br />Page 2 <br />