Laserfiche WebLink
160 Chair Vanderwall suggested a reasonable annual amount for build -out, including <br />161 a discussion of funding sources as a first step in driving that build -out plan. Chair <br />162 Vanderwall noted the challenges in doing so, while also wanting to get the biggest <br />163 bang for the buck as soon as feasibility possible, and not necessarily always <br />164 applying to smaller projects, but including the overall goal of connection and <br />165 safety to get more foot traffic and people away from the roadway. Chair <br />166 Vanderwall opined that the sooner those safety pieces were in place, the better, <br />167 especially in high traffic count areas (County Road B -2, and Victoria Street) <br />168 <br />169 Member DeBenedet concurred that safety should be a strong criteria; along with <br />170 taking into consideration those roadways that would be reconstructed by Ramsey <br />171 County (Rice Street and County Road B -2) and incorporate sidewalk work with <br />172 those projects when possible to reduce costs. <br />173 <br />Page 4 of 10 <br />