My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-002
Roseville
>
Planning Files
>
2009
>
pf09-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 3:46:44 PM
Creation date
6/21/2013 2:49:37 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-002
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />Roseville Planning Commi.ssion Meeting <br />Wednesday, August 3, 1983 <br />-2- <br />Re commendation <br />�. <br />Matson Moved and Berry Seconded that the Planning Commission recommend <br />approval of the special use permit, with the condition that the project <br />be developed in accordance with plans dated 7/8/83; and that the Commission <br />continue action on the sign variance to the next meeting to allow a deterr,iin- <br />ation to be made on the need for the variance. <br />Roll Call, Ayes: Matson, Moeller, Wiski, Berry, Dressler, and Rukavina. Nays: <br />None. <br />Planning File 1451 - Art Mueller request for Yreliminary plat and special use <br />permit for PUD at 1995 County Road B. <br />Presentation <br />Mr. Dahlgren indicated that Mr. Mueller proposes to construct a 53-unit residential <br />development on a 14.6 acre site located between Gluek Lane and Midland Gove <br />Condominiums. <br />The northern portion of the site will utilize private access drives to the <br />structures. The applicant has proposed to petition the City for the construction <br />of the street from County Road B to the stub street, westerly of Gluek Lane. <br />This stub street was platted in the early 1950's, but never was constructed. <br />It is important this stub be constructed to provide two means of access to both <br />Gluek Lane and the proposed residential development. <br />Mr. Dahlgren also indicated there are some unanswered drainage questions which will <br />have to be dealt with before the plan is finalized. <br />Discussion <br />Rukavina expressed concern that the house numbering system remain consistent <br />with Roseville's system. <br />Moeller inquired as to the time schedule for the development. Mr. Mueller explained <br />that the homes would be built on a pre-sold basis only. Construction is planned <br />in 4 or 5 phases over a period of 2-4 years. <br />Dressler expressed concern regarding the ��roposed tennis court. She felt it <br />should not be included as part of the development. <br />In response to a question from the audience, Mr. Dahlgren explained that the cost <br />of the public street and utilities would be assessed to the developer, who could <br />then pass them onto those who purchase homes in the development. The developer <br />has aqreed to pay the costs of constructing the stub street between Gluek Lane <br />and the proposed development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.