Laserfiche WebLink
^� r�,. <br />7.8 Sewer and Water: Sewer and water will be provided by a water main and sanitary sewer <br />connection located within County Road B. <br />7.9 Private Utilities: The private utilities, such as electricity, cable, telephone, and natural <br />gas, will be designed and coordinated through the Public Works Department to be <br />underground and utilize a joint trenching system, where applicable. <br />8.0 STAFF COMMENTS: <br />8.1 On November 12, 2008, the applicant and Station 19 Architects held the required open <br />house for the proposed Orchard development. There were between 50 and 60 property <br />owners/residents in attendance. Questions/concerns regarding the land use process, the <br />change in land use designation, the rezoning, change in the existing site grade, distance of <br />the proposed building from property lines, traffic, height of the building, and <br />environmental impacts were expressed. <br />8.2 On January 8 and 15, 2009, the Roseville Development Review Committee (DRC) met to <br />review the General Concept proposal for the Orchard. All in all the DRC supported the <br />change in Comprehensive Land Use Map designation to High Density Residential; the <br />zoning to general Residence District; and the proposal as currently situated on the subject <br />parcel. <br />8.3 This proposal and its proximity to existing residential is of similar scale, mass and <br />distance. Most notably are the similarities between the recent Applewood Pointe <br />development and Greenhouse Village. <br />8.4 However, the Planning Division is interested in ways to minimize building mass. Such <br />options could include reducing the number of units and providing a greater setback; <br />limiting the height, which in turn would required a partial or complete redesign; of <br />flipping the structure so that the long portion lies adjacent to County Road B. <br />8.5 Prior to the General Concept plan being forwarded to the City Council, the Planning Staff <br />would like to explore with the applicant possible modifications to reducing the mass of <br />the building. The Planning Division is also interested in feedback form the Planning <br />Commission regarding this item. <br />9.0 STAFF RECOMMENDATION: <br />9.1 The Planning Division recommends APPROVAL OF THE COMPREHENSIVE LAND USE MAP <br />AMENDMENT, the REZONING, and the GENERAL CONCEPT PLANNED UNIT DEVELOPMENT <br />for the property at 2025 County Road B for a 77-unit active senior living community by <br />Art Mueller, with the following conditions: <br />a. The applicant shall meet with the Planning Staff to explore ways to potentially <br />reduce the mass and scale of the building prior to the General Concept being <br />forwarded to the City Council for consideration. <br />b. Parking shall satisfy the City Code. <br />c. The final landscape plan shall include additional screening along the south and <br />north sides of the building. This screening may include a decorative fence and/or <br />berm as well as landscaping. <br />PF09-002_RPCA 020409.doc90308 Page 5 of 6 <br />