My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-002
Roseville
>
Planning Files
>
2009
>
pf09-002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 3:46:44 PM
Creation date
6/21/2013 2:49:37 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-002
Planning Files - Type
Planned Unit Development
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
431
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Orchard Sitin� and Desi�n revisions: <br />r� ?!1L � �t � - <br />��r <br />��.:d..�,,'�'^. » �..; <br />� <br />7'he (�rchard <br />• The Southeast Wing of the building now jogs at an angle as it approaches County Road B. This jog will <br />help the adjacent view and give the building some additional character, privacy, and curb appeal. The 3rd <br />floor steps back 10-feet further from the property line than the lower floors. At the Northwest corner, the <br />3rd floor steps back one unit. <br />• The angled Wing feature along County Road B will feature a small end cap roof to reduce the height of the <br />structure. The roof line has been lowered and some additional design features added to give the <br />appearance of a single-family structure at the south elevation. <br />• Both the north and east sides of the building have increased setbacks from the prior proposals. The north <br />setback varies between 21 feet and 36.9 feet, while the east setback varies between 30.5 feet and 51.7 feet <br />in distance. <br />The exterior building materials are still proposed to be low maintenance, with some additional accent <br />features added to give the exterior more flair, and to better reflect a residential design-build type product. <br />The total impervious surface for the site has decreased from 60% in the original proposal to 44% in the <br />current proposal. 56% of the current 2.61 Acre site will be green. <br />� <br />� <br />) <br />
The URL can be used to link to this page
Your browser does not support the video tag.