My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-004
Roseville
>
Planning Files
>
2009
>
pf09-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 9:01:05 AM
Creation date
6/24/2013 3:37:52 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-004
Planning Files - Type
Interim Use Permit
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-. <br />Attachment C <br />Roseville Library Interim Use Permit Application <br />7. Additional Information <br />a. Legal Description Lot 2, Block 1, Twin Lakes Center <br />PIN 04.29.23.34.0032 <br />b. Proposed Plans <br />Included are diagrammatic drawings showing proposed interior wall demolition and a <br />sketch layout of the Library furniture and shelving. An 1/8" scale drawing of the existing <br />plan is available. Also included is a site plan indicating parking spaces. No site drainage, <br />landscaping or exterior building elevation changes are contemplated. <br />c. Open House Summary <br />An open house has not been held. Please advise if one is required. <br />d. Consultant Fees <br />Not applicable <br />e. Narrative <br />Ramsey County is in the process of planning an expansion to the Roseville Library at <br />2180 Hamline Ave. The extent of the construction will require that ail library services be <br />discontinued and all contents be removed from the buiiding. The closing is expected to <br />last approximately 15 months beginning approximately March 31, 2009. On May 21, <br />2008, the Ramsey County Library Board considered the option of completely <br />discontinuing Library services during the construction or providing limited services at <br />another location. They chose to provide the limited services. In support of that decision, <br />the Roseville City Council, at their September 22, 2008 meeting, adopted a resolution <br />encouraging the Library's continued operation within the City limits during the <br />construction process. At the direction of the Library Board, the Library staff reviewed a <br />number of locations for the interim services and recommended the Twin Lakes <br />Corporate Center III, 2680 Arthur Street in Roseville as the first choice. The size and <br />quality of the space, the easy access and the proximity to the Rosedale Shopping Center <br />all favored that choice. Further, they felt the quiet operation of the Library would be <br />compatible with the office/light industrial character of the area and the existing road <br />system would easily accommodate the traffic generated by the Library. At the <br />December 10, 2008 Library Board meeting, the general terms of a lease for the Twin <br />Lakes Corporate Center space were approved by the Board and staff were directed to <br />execute the lease. That action was ratified by the Ramsey County Board of <br />Commissioners at the December 16, 2008 Board meeting. The lease is for 15 months <br />commencing April 1, 2009. <br />
The URL can be used to link to this page
Your browser does not support the video tag.