Laserfiche WebLink
�-� 4.0 <br />2_3 4.1 <br />�' <br />2� 4.2 <br />2� <br />2; <br />G J <br />z� <br />3;; <br />32 <br />33 <br />;3 G <br />3� <br />30 4.3 <br />:�? <br />33 <br />39 <br />G�; <br />41 rJ.O <br />42 <br />43 <br />BACKGROUND <br />The property at 2680 Arthur Street has a Comprehensive Plan designation of Business <br />Park (BP) and a zoning classification of Retail Office Service District (B-4). <br />This nvTER�M usE request has been prompted by the applicant's desire to establish a <br />temporary and limited library facility in a location where the zoning does not permit <br />libraries. Although the Library has not yet applied for approval of the Final PUD for the <br />expansion of its permanent facility, the intended timeline between the anticipated interim <br />use approval and the start of construction at the permanent facility does not leave much <br />time for transferring the media collection to the proposed temporary facility. Concurrent <br />with this application, Ramsey County Library has applied for the building permits needed <br />to make the interior modifications for the temporary facility and, as long as the applicant <br />is willing to accept the risk that the interim use could be denied, Community <br />Development staff will issue the building permit as soon as the tenant improvement plans <br />have been approved. <br />Such applications were formerly referred to as Interim Use Permits, but the word <br />"permit" is being eliminated in an effort to sharpen the distinction between land use <br />approvals and building permits. Although this represents a change in terminology, the <br />nature of interim use approvals will remain the same because they never actually involved <br />permits per se. <br />INTERIM USE APPLICATIONS <br />Section 1012.09 (Interim Uses) of the City Code establishes the regulations pertaining to <br />INTERIM USES. <br />a�� 5.1 Section 1012.09A states: The City Council may authorize an interim use of property. <br />�.� Interim uses may not be consistent with the land uses designated on the adopted Land <br />ab Use Plan. They may also fail to meet all of the zoning standards established for the <br />a� district within which it is located. <br />a� 5.2 Section 1012.09B states: The City Council may attach conditions to Interim Use Permits <br />4� �sicJ. In reviewing [suchJ applications, the City will establish a specific date or event <br />�o that will terminate the use on the property. The Council will also determine that the <br />� i approval of the interim use would not result in adverse effects on the public health, <br />52 safety, and general welfare, and that it will not impose additional costs on the public if it <br />s:� is necessary for the public to take the properry in the future. <br />5 � 6.0 <br />5� 6.1 <br />50 <br />51 <br />�J <br />59 <br />6c <br />STAFF COMMENTS <br />Section1005.015 (Business District Uses) of the zoning regulations prohibits public uses <br />(e.g., libraries) in B-4 districts, which are intended to facilitate relatively high intensity, <br />regional commerce. The primary goal of the proposed INTER�1�t USE is to continue <br />providing limited library services while the existing Ramsey County Library facility is <br />being expanded as proposed in the Library's PUD application; Ramsey County is still in <br />the process of applying for Final PUD approval. <br />6� 6.2 A building permit is required for various improvements to make the office/warehouse <br />62 space suitable for the Library's needs, and although special approvals are being sought to <br />6:� allow this temporary use, any building modifications must meet the requirements of the <br />s� building code. <br />PF09-004 RCA 022309 <br />Page 2 of 4 <br />--� <br />� <br />