Laserfiche WebLink
-� <br />March 5, 2009 <br />City of Roseville <br />Plenning Commission <br />c/o Community Development Ilepartmmt <br />2660 Civic Center Drive <br />Roseville, MN 55113 <br />� Attachment C <br />?AIMERC!AL EEAL F.S'A�F. SF.fl:"]ES I�C. <br />RE: PUD Amendment Application <br />FagleCrest Tertace <br />T-Mobile telecommunications facility <br />Dear Sir's and Madam's: <br />On behalf of T-Mobile, please accept this letter and the attached PUD Ameudment Application to elbw T-Mobile to <br />urilize a portion of the rooftop area at EagleCrest Terrace for the purposes of mounting penel antennas to support the <br />deployment of the'v wireless network. <br />EOUIPMENT NEEDS AND REOUIREMENTS <br />Deployment of the T-Mobile sysum is accomplished through the siting of "Cell Sites" loceted ai stretegic locadons <br />tfvoughout any given markec T-Mobile Rsdio Frequency Engineers determine the location of these Cell Sites after <br />analysis of customer demand, site topo�aphy, signal propagation models and rolationship to existing Sites. The <br />proposed EagleCrest Terrace facility was idenHfied by T-Mobile as a vitel Siu necessary to meet the increasing <br />customer demands in the vicinity of Snelling Avenue and the surrounding neighborhood5. <br />A Cell Site is typically located on an e�cisting structure (in this case, a multiple story residenual building) t6at will <br />provide the necessary height for edequate propagation of the signal to reac6 the rorgeted needs aroas. At EagleCrest, <br />the following equipment will need to be placed in order to meet system requ'vemenu: <br />. Three (3) panel antennas mounted in a three (3) sector arrangement. As proposed, two (2) of the antennas <br />would be mounted to pipes aod located on the existing false fepade of the building as depicted on the attached <br />plen set and photo simulauon. The third antenna would be located on the proposed equipment platform and <br />face west off of the roof. <br />. EquipmeM necessary for the opeiadon of the Site would be loc�ted on a] 0' x 20' raised platform located on the <br />back pofion of the roof as depicted on the plan set. T-Mobile is proposing ro incorporate a screenwall on the <br />platfottn to provide screening of the equipmen[. <br />'Ihe proposed design of this instellation would appear to have no ePfects on the exisdng PUD or operation of the <br />EagleCrest Terrace faciliry. <br />