My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-005
Roseville
>
Planning Files
>
2009
>
pf09-005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 11:32:12 AM
Creation date
6/24/2013 3:38:24 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-005
Planning Files - Type
Planned Unit Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: � <br />_ � - <br />There will be adequate parking for the uses of the site <br />above and beyond the parkinq needed for the adjacent student <br />housing. Zf this parking is provided in a parking deck or <br />ramp, the structure will meet all applicable setbacks and <br />will be constructed of high quality materials compatible <br />with the design of the other buildings in the PUD, and will <br />be adequately landscaped on all sides, especially toward <br />Snelling Avenue. <br />Compliance with these issues will be determined by the City <br />Development Review Committee. If the Development Review <br />Committee believes that the design does not fit within these <br />guidelines, this portion of the project will be referred to <br />the Planning Commission for an amendment to the PUD. <br />That no building permits be issued for the project until <br />after a closing occurs on the Simpson parcel. There shall <br />be no use of the site other than the existing auto sales <br />leasing use or the future new colleqe building without prior <br />approval of the City Council. <br />8. That the ponds be maintained by the applicant, designed to <br />meet Metropolitan Council recommended standards. The City <br />will maintain the pipes leadinq to the ponds, and Colleqe <br />Properties, Inc. will be responsible for mowing and other <br />aesthetic maintenance of the ponds. <br />9. That the exterior materials of the motel be changed to <br />include brick, in a similar fashion to the independent <br />living building, such taht there would be brick all around <br />the lower level and extended up to the roof at key massing. <br />10. That the approvals are continqent upon submittal and <br />approval of a Comprehensive Plan Amendment to the <br />Metropolitan Council. <br />11. That the independent living building be constructed as shown <br />on the approved plan, with the height of the flat portions <br />of the roof not exceeding 66 feet, the mansard style roof <br />not exceeding 76 feet in height, and the pitched roofs <br />covering stairwells and elevator penthouses not exceed 82 <br />feet in height. <br />12. That College Properties, Inc. dedicate a new frontage road. <br />
The URL can be used to link to this page
Your browser does not support the video tag.