Laserfiche WebLink
.� <br />�& � � <br />.�td!dEF.::A:. F.E,P.: ES-n-F. SFkS:�: F.^ ItiC. <br />March 5, 2009 <br />Ciry of Roseville <br />Planning Commission <br />c/o Community Development Departrnent <br />2660 Civic Center Drive <br />Roseville, MN SS113 <br />RE: PUD Amendment Application <br />EagleCres[ Terrace <br />T-Mobile telecommunications faciliry <br />Deaz Sir's and Madam's: <br />On behalf of T-Mobile, please accept this letter and the attached PUD Amendment Application to allow T-Mobile to <br />utilize a portion of the rooftop area at EagleCrest Terrace for the purposes of mounting panel antennas to support the <br />deployment of the'v wireless network. <br />EOUIPMENT NEEDS AND REOUIREMENTS <br />Deployment of the T-Mobile system is aceomplished ttvough the siting of"Cell Sites" loca[ed at strategic locations <br />throughout any given market. T-Mobile Radio Frequency Engineers decermine the locazion of these Cell Sites after <br />analysis of customer demand, site topography, signal propagation models and relationship to existing Sites. The <br />proposed EagleCrest Terrace facility was identified by T-Mobile as a vital Site necessary to meet the increasing <br />customer demands in the viciniry of Snelling Avenue and the surrounding neighborhoods. <br />A Ceil Site is typically located on an existing structure (in this case, a multiple story residential building) tha[ will <br />provide the necessary height for adequate propagation of the signal to reach the targeted needs azeas. At EagleCrest, <br />the following equipment will need ro be placed in order to meet system requiremenu: <br />• Three (3) panel antennas mounted in a three (3) sector anangement. As proposed, two (2) of the antennas <br />would be mounted to pipes and located on the existing false Faqade ofthe building as depicted on the attached <br />plan set and photo simulation. The third antenna would be located on the proposed equipment platform and <br />face west off of the roof. <br />• Equipment necessary fo� the operation of the Site would be bcated on a] 0' x 20' raised platfortn located on the <br />back portion of the roof as depicted on the plan set. T-Mobile is proposing [o incorporate a screenwall on [he <br />platform to provide screening of the equipment. <br />The proposed design of this installation would appear to have no effecu on the existing PUD or operation of the <br />EagleCrest Terrace facility. <br />