My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-010
Roseville
>
Planning Files
>
2009
>
pf09-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 3:32:19 PM
Creation date
6/24/2013 3:41:10 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-010
Planning Files - Type
Conditional Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
! �. <br />Fugitive emission calculations included storage piles, truck traffic on haul roads, <br />unpaved public roads, paved public roads, and unvegetated areas. Negotiated " <br />implementation of control measures to bring azea into attainment for particulate <br />matter {1987 - 1992). <br />• Negotiated administrative orders for Twin Cities and Rochester Sulfur llioxide <br />State Implementation Plan. Negotiations included EPA, MPCA, and facility staff. <br />Involved reviewing and approving methodologies far calculating point source and <br />fugitive emissions for major comhustion sources including several power plants, <br />district heating stations, (arge combustion sources and two oil refineries. <br />Negotiated implementation of control measures to bring area into attainment for <br />sulfur dioxide {1987 -1982). <br />• Prepared Total Suspended Particulate State Irr►plementation Plan for Duluth <br />harbor area. Project involved reviewing and approving emission calculations for <br />point and fugitive dust sources and developing air quality permit amendments to <br />enforce controls to bring area into attainment for particulate matter (1987 - 1992). <br />• Several fast track air permit modifications for Minnesota manufacturers (1992 - <br />1997). <br />• Won a Seven Wonders of Engineering Award for a Fast Track Air Permit from <br />the Minnesota Society of Professional Engineers for expansion at a chemical plant <br />{ 1992). <br />• Air quality permit modification to allow flexibility of operations for a Minnesota <br />building products manufacturer (199b). <br />• Developed several air quality ruies, including new source review rule. Frocess <br />involved establishing technical advisory committees, holding public hearings, and <br />preparing "Statement of Need and Reasonableness" and technical support '� <br />documents evaluating impact of rules (1987 - 1992). <br />Environmental Review <br />4ther <br />• Environmentai Assessment Worksheet for Combined Heaf and Power Plant <br />(2047}. <br />• Environmental Assessment Worksheet for Wastewater Treatment Plant <br />Expansion (2006 - 2007) <br />• Prepared Environmental Assessment Worksheets in Minnesota for piant <br />expansions at a com processing facility (1994). <br />• Prepared environmental review for Pennsylvania composites plant (1998). <br />• Environmcntal assessment worksheet for Minnesota plastics plant expansion <br />(1996}. <br />• Environmental Impact Statement for reliever airport expansion (1493 - 1995) <br />• Environmental portion for 6 reliever airport master plans (1993 - 1995) <br />• Watershed management planning for Minnesota watershed districts (1992 -- l 997) <br />4 `'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.