My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-010
Roseville
>
Planning Files
>
2009
>
pf09-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 3:32:19 PM
Creation date
6/24/2013 3:41:10 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-010
Planning Files - Type
Conditional Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
159 <br />160 <br />161 <br />162 <br />163 <br />164 <br />165 <br />r � <br />• Create a noise control contingency plan that would include back up alarm <br />mitigation. Consider alternative's if allowed by OSHA such as camera systems or <br />lights. The plan would include no banging of truck tailgates. <br />• The City of Roseville may require a future study of ways to mitigate dust if initial <br />control plan is not effective. <br />The motion to include these conditions of approval passed 5-0. <br />166 H.O SUGGESTED ACTION <br />167 By motion, approve the proposed coNn�T�oNAL usE allowing outdoor storage of equipment <br />168 and materials at 2280 Walnut Street, based on the comments and findings contained in Sections 5 <br />169 & 6 of this report and the following conditions: <br />170 1) Outdoor stockpiles of aggregate materials shall be located on the property such that they meet <br />171 or exceed the property line setbacks required for buildings in the same zoning district. <br />172 2) Rubble asphalt and concrete crushing operations shall be limited to a maximum of two 3- <br />173 week periods per calendar year and shall be separated by a minimum of 120 days. The hours <br />174 of crushing shall be limited to 7 am — 7 pm. <br />175 <br />176 <br />177 <br />178 <br />179 <br />180 <br />3) The City shall be provided Material Data Safety Sheets for all materials used as part of the <br />operation. <br />4) The applicant shall work with the Rice Creek Watershed District on a storm water plan for <br />the site that doesn't include infiltration. <br />5) The applicant shall consider storm water reuse for dust control and tire tracking control with <br />tire wash off system. <br />181 6) The applicant shall create a noise control contingency plan that would include back up alarm <br />182 mitigation. Consider alternative's if allowed by OSHA such as camera systems or lights. The <br />183 plan would include no banging of truck tailgates. <br />184 7) The City of Roseville may require a future study of ways to mitigate dust if initial control <br />185 plan is not effective. <br />Prepared by: Patrick Trudgeon, Community <br />Development Director (651) 792-7071 <br />Attachments: A: Area map <br />B: Aerial photo <br />C: Applicant narrative <br />K: <br />L <br />Proposed site plan <br />Proposedlandscape plan <br />Illustrations of proposed screening <br />Planning Commission minutes � <br />Letter from applicant dated May 8, 2009 <br />Letter from Meritex dated May 13, 2009 <br />Letter from Minn. Comm. Railway dated May 13, <br />2009 <br />City Council Meeting Minutes dated May 18, <br />2009 <br />Response from Bituminous Roadways regarding <br />PWET's conditions. <br />090615 RCA Bituminous Roadway CU <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.