My WebLink
|
Help
|
About
|
Sign Out
Home
pf09-010
Roseville
>
Planning Files
>
2009
>
pf09-010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2014 3:32:19 PM
Creation date
6/24/2013 3:41:10 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
09-010
Planning Files - Type
Conditional Use Permit
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
651
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />� � <br />La�'k�ri <br />I�o��man <br />aTroar+evs <br />October 21, 20l 0 <br />The Honorable Mayor of Roseville <br />City Cowlcil Members <br />2660 Civic Center Drive <br />Roseville, MI� 55113-2815 <br />Re: Bituminous Road�vays Asphalt Plant Technical Data <br />Dear Mayor and City Council Members: <br />Larkin Hof�man Daly & Lindgren Ltd. <br />]500 Wel!s Fargo Plaza ��''� <br />7900 Xerxes Avenue South <br />Minneapolis, Mumesota 55M131-1i94 <br />ceaevRi 952-835•3800 <br />�Ax. 952•89G•3333 <br />wEa ti�nv.larkinhoffinan.co�n <br />In response to the discussions about Bituminous Road�.�ays' proposed asphalt plant and its <br />impacts, we thought it would be important for you to have information that analyzes the limited <br />magniiude of possible effects from the project. Enelosed are the following: <br />• Technical Memorandum regarding noise monitoring studies for proposed Roseville <br />asphalt plant prepared by �b�enck Associates, Inc. dated October 7, 20I0. <br />• Opinion of Edward Terhaar, P.E. on traffic impacts associated with the proposed � <br />Bituminous Roadways asphalt plant in Roseville. <br />• Technical Memorandum regarding Additional Odor/Hydrogen Sulfide Ambient Air <br />Quality Analysis prepared by Wenck Associates, Ine., dated October 20. 2010. <br />As is evident from the documents, there has been a significant amount of analysis and evaluation <br />of the proposed asphalt plant. lt is also evident from these documents that the rational, <br />thoughtful, evaluation of the potential environmental impacts being conducted through the <br />Minnesota Poliutioti Control Agencies environmental assessment worksheet and air emissions <br />pennitting processes is an effective mechanism to address concerns raised by persons <br />comttlenting on this facility. <br />Three very important considerations for the Cit}� are the lack of significant impacts in the areas <br />of odor, traffic and noise relating to the proposed facility. <br />Vl�e hope this information is helpful as the City works through these issues. Bituminous <br />Road�vays and its consultants are always available to provide further inf'ormation and/or to <br />respond to questions or comments. <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.