Laserfiche WebLink
� <br />��`� �1`.JL� <br />� <br />COMMUNITY DEVELOPMENT <br />2660 Civic Center Drive ❖ Roseville, MN 55113 <br />Phone: (651) 792-7005 ❖ Fax: (651) 792-7070 <br />�.. <br />INTERIM USE PERMIT APPLICATIO <br />CITY CODE SECTION l 012.09 <br />www.ci.roseville.mn.us <br />p�C�C���]C�- <br />� ��� 1 � Z0�8 <br />� APPLICATION FEE: $600 <br />(Fee should be made payable to Ciry of Roseville upon submittal of completed application.) <br />Please complete the application by typing or printing in ink. Use additional paper if necessary. <br />1. Property Owner Information: <br />Company name: ola Dominion Freight Line, Inc <br />Last name: M�cartY First name: Joel <br />Address: soo Old Dominion Way C1ty�SlQZ6�Z1�J: Thomasville/NC/27360-8923 <br />PI10/1E Y1ZlYl1bEY: (336) 822-5231 <br />EY11Q'll QCl�Cl�YeSS: J oel . mccarty@odf 1. com <br />2. Applicant Information: (ifdifferent,from above) <br />Company name: ola Dominion Freight Line, Inc & Cent Ventures 2 <br />Last name: o�er & Noble First name: o�er & Thomas <br />Address: o�er & 1660 s. x� ioo, su�te sooCity/State/Zip: owr�er & st. Louis Park/MN/55416 <br />Phone number: o�er &(952) 224-2500 Email address: owr�er & tnoble@westreinc.com <br />3. Address(es) of Property Involved: ( f different from above) <br />2750 Cleveland Avenue S <br />4. Zoning Designation: I- 2 <br />5. Comprehensive Plan Designation: BP (underlying a6> <br />6. Statement of Intent: Briefly describe what will be done on or with the property reyuiring the <br />Interim Use Permit and how long the use will continue. <br />The process of delineating a parcel for the Metropolitan Transport Commission ("MTC") of <br />applicants wish to confirm their continued use of the property for trailer parking and outside <br />storage until such time as the property is redeveloped. No changes to that part of the propert� <br />noT sol d to Y_he M'r'C are nl arLned and YhP n_ronerY_�r w; l l con ; nue Y_n bP nav d and n d xcept <br />for the possible temporary use of the site for Transit purposes until Mount Ridge Road and <br />Twin Lakes Parkway are completed. <br />Interim Use Permit Application Page 1 of 2 <br />