My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0701_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0701_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 10:11:10 AM
Creation date
6/27/2013 1:09:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Curbside Single Stream (Option Two City-Owned Carts) <br />The Contractor or designated subcontractor shall work with the City <br />to procure 64-gallon carts for use in the single stream collection <br />program. The carts will become the property of the City of Roseville <br />at the end of the contract period for use in the next contract cycle. <br />The Contractor or designated subcontractor will maintain a sufficient <br />new and replacement cart inventory that will be purchased by the <br />City. The contractor shall service and repair carts to meet supply and <br />demand needs for the entire term of the contract. <br />Proposers must clearly specify their proposed single-sort cart <br />manufacturer. <br />Thirty-two and ninety-six gallon carts of similar design shall be <br />provided to residents who request a different level of service. <br />Additional carts will be provided at no extra charge to residents who <br />request them. <br />The Contractor shall be responsible for preparing a <br />comprehensive cart rollout plan and schedule for the initial cart <br />distribution. <br /> The Contractor will work with the City to create the <br />educational material for distribution to customers. This educational <br />material and its distribution may meet the annual mailing <br />requirements detailed in 6.05. <br />At a minimum, the plan must have the following items: <br />1. Single stream system instructional brochure for customers (which <br />must be approved by the City before printing). <br />2. Single stream system instructions (text and images) for the City’s <br />website and newsletters. <br />3. Final cart, label and logo specifications (including details of cart <br />color, lid color, and draft content of any label instructions) to be <br />proposed by the Contractor and approved by the City. <br />4. Cart order quantity (including specified overage to have in stock as <br />excess inventory). <br />5. Contractor’s plan for cart roll-out to customers, including start and <br />end dates. <br />Cart rollout shall be completed December 27, 2013. The Contractor <br />or designated subcontractor shall provide initial distribution of single <br />stream carts to customers, whether carts are owned by the City or the <br />Contractor. <br />5.05. Collection <br />17 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.