My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0701_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0701_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2013 10:11:10 AM
Creation date
6/27/2013 1:09:39 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.04. Estimating Process Residuals <br />The Contractor shall provide the City a written description of the <br />means to estimate process residuals, as defined in 4.34, derived from <br />the City’s recyclables. This written description shall be reviewed and <br />approved in writing by the City. This written description shall be <br />updated by the Contractor immediately after any significant changes <br />to the processing facilities used by the Contractor. <br />7.05. Performance Monitoring <br />The City will monitor the performance of the Contractor against <br />goals and performance standards required within this RFP and in the <br />contract. Substandard performance as determined by the City will <br />constitute non-compliance. If action to correct such substandard <br />performance is not taken by the Contractor within 60 days after being <br />notified by the City, the City will initiate the contract termination <br />procedures. <br />The City shall have the right, during the term of the Contract, to have <br />a representative on Contractor’s premises to monitor the operation of <br />the Contract. Such representative shall only be allowed on <br />Contractor’s premises during normal business hours. <br />7.06. End Market Certification <br />The Contractor shall provide in its Proposal and by January 31 of <br />each year through the term of the contract written certification to the <br />City that all recyclable commodities identified are indeed recycled <br />and not disposed. Such written certification shall identify all end <br />markets manufacturers or processors used for each of the recyclable <br />commodities. The Contractor shall attach written certification from <br />each end market and a list of products manufactured using the <br />recyclable materials collected from the City. The Contractor shall <br />specify the percentage of each material collected that goes to each <br />end market. Contractor must request in writing if it wishes to have <br />the certification be considered proprietary information. <br />8. PAYMENT AND DAMAGES <br />8.01. Term of Contract <br />31 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.