Laserfiche WebLink
� � <br />.,.. b. Any future ground equipment shall be screened consistent with the zoning <br />:3� requirements in effect at that time; <br />..� c. The top of the proposed monopole tower shall not be higher than 125 feet above <br />sc the grade at the base of the structure; <br />: � d. The monopole and all ground equipment shall be painted or otherwise colored to <br />:2s: blend with the surroundings as much as possible; <br />:t.:: e. Any wiring serving the equipment shall be buried; <br /><�;� f. External lights (i.e., those not integral to the equipment itsel� shall not be <br />4`� installed on the tower ar equipment; and <br />4� g. Prior to installing equipment, all service providers shall submit documentation <br />4:� demonstrating that the telecommunication equipment will operate within the <br />4' technical requirements of the Federal Communications Commission. <br />a�� The motion for the adoption of the foregoing resolution was duly seconded by Council <br />q e: Member and upon vote being taken thereon, the following voted in favor: ; <br />; � and voted against. <br />�:: WHEREUPON said resolution was declared duly passed and adopted. <br />Page 2 of 3 <br />