Laserfiche WebLink
D���;��i' <br />1 Member Boerigter asked if Rice Creek Watershed review had been completed (in process). <br />2 Paschke explained that the City Code will require some additional treatment of runoff from the <br />3 site. Member Boerigter asked if court yard irrigation should be a condition of approval. (Yes, it <br />4 should if the area is not used as an infiltration area) <br />6 Member Wozniak asked if the calculation of impervious surface had been completed. Paschke <br />7 explained for churches there is no pervious surface-green space percentage, but runoff from any <br />8 increase in impervious surface must meet the Watershed and the City Code requirements. <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />Chair Traynor clarified the required church (main building) setback of 30 feet from all <br />residential property lines. <br />Planner Paschke explained that one property owner has expressed concern about drainage and <br />will work with the church and the City Engineer to resolve possible drainage problems. <br />16 Chuck Liddie, church architect, illustrated a Rice Creek Watershed email correspondence <br />17 waiving requirements for this project. The plan now includes that all new drainage from the <br />18 additions will drain to the courtyard for infltration. The Commission received the Watershed <br />19 email waiver and paced it on file. <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />Member White reviewed the architectural design and explained that it was a fine example of <br />renovation design and materials. <br />Since there were no further comments, Chair Traynor closed the hearing. <br />Motion: Member Traynor moved, second by Member White to recommend approval of a <br />conditional use permit for Rose Hill Alliance Church, 2105 Roselawn Avenue, based on the <br />findings of Section 5 and conditions of Section 6, adding condition "H" — a landscape plan to <br />include irrigation of the courtyard if no rain garden infiltration system is used for the <br />improvement area, of the project report dated February 1, 2006. <br />Ayes:6 Nays: 0 Abstain:0 <br />Motion carried. 6-0 <br />