Laserfiche WebLink
-, ^ <br />> the <br />» majority of time inside the buildings in play areas. After 7 pm they <br />> would <br />» kennel a maximum of 17 dogs overnight. For the most part they would <br />» be kept in their "hotel" room and would not be outside, except to <br />» relieve themselves. <br />» <br />» In regards to barking and the interaction with neighborhood dogs, it <br />» is <br />> a <br />» good question. I have attached a reply they gave us regarding <br />» barking <br />> from <br />» their site. Also there will be an additional fence around the <br />» outside <br />> play <br />» area in addition to the fence already at the property line. The <br />» outdoor play area would be located on the southeast side of the <br />» property <br />> adjacent <br />» to <br />» the Walters and Gustafson properties. The outdoor play area is <br />» proposed <br />> to <br />» be 15 feet back from the southern property line (the residential <br />> property <br />» lines). The applicant has indicated that they initially expect <br />» having about 20 dogs at doggie day care, going up to 40 in perhaps a <br />» year or two, <br />> with a <br />» maximum of 80 dogs in future years. <br />» <br />» Since the activity is either inside or on the eastern side of the <br />> property <br />» there is nothing proposed to be done on the west side of the property <br />» on the application. We could look at correcting the situation with <br />» fence but <br />> need <br />» to make sure it is related to the doggie day care operation. The <br />> interim <br />» use request is due to the fact that we don't have a doggie day care <br />» specifically listed as a use. We do allow kennels as a conditional <br />» use, but this is more than a kennel, hence the interim use. Also the <br />» 2030 Comprehensive Plan identifies the area along County Road C to be <br />» redeveloped as High Density Residential. There are currently no <br />» plans to redevelop <br />> any <br />» of the property and it will be many, many years before anything would <br />» be done on the properties. Therefore, an interim use is most appropriate. <br />» <br />» I hope my response gives you the answers to your questions. Let me <br />» know <br />> if <br />» you need more information. I would also suggest contacting the <br />> applicant <br />» if <br />» you have some questions/concerns about the operation. Her contact <br />5 <br />