Laserfiche WebLink
The Fire Dept will begin offering CPR/AED at a rate of $80 per <br />student and Safety Training at a rate of $80 per hour. Costs will cover <br />prorated trainer's salary/benefits, books, training materials, <br />administrative time. These services will be offered to businesses once <br />the City’s fee schedule is amended to include these fees and this <br />IR2025 goal will be complete. <br />RG 7/08 <br />Community Center Discussion <br />Community Center identified in master plan implementation program <br />– to be worked on in parallel to the step one Park Renewal Program <br /> LB <br />10/11 <br />Preferred site of Community Center identified as City Hall/Skating <br />Center Campus <br /> LB 10/11 <br />Community Center identified in Adopted Park Master Plan, <br />November 2010 <br /> LB 1/11 <br />Discussions during Master Plan Implementation Phase, November <br />2010 <br /> LB 1/11 <br />Will be incorporated into the anticipated Master Plan process to <br />determine need and locations. <br />LB 7/08 <br />Further discussions at Joint School Board/City Council Meeting on <br />6/26/12 <br />Establish a Community Resource and <br />Proposal accepted by the 2009 Leadership St. Paul Program to assign <br />Volunteer Center/Network with support <br />a group to Roseville to enhance the volunteer program by creating a <br />and coordinating staff to recruit, train, <br />comprehensive community volunteer model. <br />LB 3/09 <br />nurture volunteers. <br />Researching possible resources needed to establish such a program <br />and what a program of this type would look like. <br />LB 7/08 <br />Identify segments with poor or no <br />Completed Construction of Fairview NTP Pathway south of Co Rd B <br />connection. Follow Master plan guide. <br />in 2011 <br />DS 1/12 <br />Address Hwy 36 and Snelling crossing <br />Completed Dale Street Sidewalk <br /> DS 1/12 <br />barriers: tunnels or bridges at Lydia, <br />Constructed Snelling Service Drive sidewalk from Aeon project to <br />Co C, Co B, or Roselawn <br />County Road B <br /> DS 10/11 <br />Constructing Sidewalk and Shoulders on Fairview South of County <br />Road B <br /> DS 7/11 <br />No new activity. <br /> DS 6/09 <br />Developing Fairview NTP Pathway project for 2009 construction. <br />Seeking funding opportunities <br />. DS 3/09 <br />Pathway Master Plan adopted September 08. Seeking funding <br />opportunities <br />. DS 10/08 <br />Discussed as part of Pathway Plan update, incorporate into final draft <br />plus additional locations. <br />DS 7/08 <br />Consider Roundabouts, if space and <br />Second Roundabout to be constructed in Twin Lakes Summer 2010 <br />DS <br />buying R.O.W. is feasible <br />5/10 <br />First Roundabout will be constructed late summer 2009 in Twin <br />Lakes Phase I <br /> DS 6/09 <br />Roundabout included in Phase I Twin Lakes improvements <br />construction 2009. <br /> DS 3/09 <br />No new activity <br />. DS 10/08 <br />Look into ROW requirements and identify possible corridors 2009. <br />DS <br />08 <br />7/ <br />Add buses and routes for flexibility and <br />Metro Transit evaluation Bus Rapid Transit for Snelling Ave. and <br />suburb-to-suburb travel <br />other service to area including a new Park N Ride facility in Little <br />Canada <br />DS 4/11 <br />Have had additional discussion with Metro Transit regarding <br />additional service to Park N Ride <br /> DS 4/10 <br />No new activity <br />DS 6/09 <br /> <br />