Laserfiche WebLink
Attachment A <br />• Site drainage shall be accommodated on the site so that water Is directed away from the <br />new home and the neighborhood properties. The builder must comply with any federal, <br />state or local drainage requirements. Construction of the finished structure must not <br />have a detrimental Impact on storm water drainage patterns on the adjoining properties. <br />Roof gutters will be required. <br />• Soil condition should be verified to assure that the quality of the soil can handle the new <br />constructed home. If modifications are required, proper documentation must be <br />submitted. <br />• All air conditioning units must be located in the rear yard of the house. <br />• Utility meters shall be screened from street view with locations identified on the plans. <br />The neighboring property and adjacent public streets shall be kept free of construction <br />debris at all times. The construction site shall be maintained so not to become a <br />nuisance. Under no circumstance during the construction period shall construction <br />workers, construction equipment or construction materials enter, disturb, or damage <br />neighboring properties. <br />Q.4bmkAt pJaDc=M PIogrmnU P4M i*1bW5.d3C <br />Page 4 <br />