Laserfiche WebLink
HRA Meeting <br />Minutes – Tuesday, July 16, 2013 <br />Page 2 <br />1 <br />Hughes reported that the project was intended as a three (3)-phase development as detailed in <br />2 <br />the staff report dated July 16, 2013, with the first two (2) phases anticipated in 2014. <br />3 <br />4 <br />Sherman Architect Link Wilson of Kaas Wilson <br />5 <br />Mr. Wilson recognized George Sherman as a pioneer in development projects, and his <br />6 <br />architectural firm’s involvement with Mr. Sherman and various projects since 1987. Mr. <br />7 <br />Wilson reviewed the concept plans using similar projects, and how the project would be <br />8 <br />phased. Mr. Wilson advised that sustainability had been and was an important component of <br />9 <br />multi-family housing projects given their density; and reviewed his firm’s work toward LEED <br />10 <br />certification on various projects, specifically attempting to use regional materials and create <br />11 <br />energy efficiencies. Mr. Wilson noted that some sustainability efforts were visible, while <br />12 <br />others were more internal or part of infrastructure and not visible to the public. <br />13 <br />14 <br />Mr. Wilson noted that this project site would utilize the transit lines provided along County <br />15 <br />Road C and nearby Snelling Avenue, dictating its design and organization of buildings around <br />16 <br />pedestrian pathways and access to bus stops. While still in a concept state, Mr. Wilson <br />17 <br />expressed the desire of his firm and Sherman Associates to work with the HRA and City to <br />18 <br />provide creative solutions for this site. <br />19 <br />20 <br />Mr. Hughes reviewed the projected timing for market rate apartments, with the retail pad and <br />21 <br />mixed unit proposed in 2015 at the latest. <br />22 <br />23 <br />At the request of Member Willmus, Mr. Hughes advised that the intent for DEED funds for <br />24 <br />demolition and interior abatement of asbestos materials from existing buildings on site, <br />25 <br />stormwater management and infrastructure needs. <br />26 <br />27 <br />At the request of Member Willmus related to green space ratios for Phases II and III, Mr. <br />28 <br />Wilson responded that, while unable to provide exact counts at this time, he reviewed other <br />29 <br />strategies that would meet or exceed typical Roseville ratios. Mr. Wilson provided an example <br />30 <br />th <br />of recent work by Sherman Associates of light rail work accomplished at 3550 East 46 Street <br />31 <br />in Minneapolis (Oaks Station Place), using underground strategies to delay excess rainwater <br />32 <br />runoff. <br />33 <br />34 <br />Mr. Hughes advised that it was the intent of their firm to interface to Langton Lake as much as <br />35 <br />possible to address the City’s desire that it be an amenity, with soft applications of possible <br />36 <br />individual townhome units and entrances to achieve that softer buffer, while providing an <br />37 <br />active amenity space between Phase II retail tenants and Phase I apartments. Mr. Hughes <br />38 <br />advised that the apartments would have typical market rate amenities, with more attention <br />39 <br />given to the Fairview Avenue entrances. <br />40 <br />41 <br />Mr. Wilson provided another example of a collaboration with Sherman Associates, with walk- <br />42 <br />ups provided to address diversity of apartment tenants, with senior tenants preferring upper <br />43 <br />floors for safety concerns, but younger families with pets preferring the first floor, addressed <br />44 <br />through walk-ups as one option. <br />45 <br />46 <br />Chair Maschka spoke in support of the concept, particularly the walk up options; referencing <br />47 <br />the American Boulevard development in the City of Bloomington as an example of a great <br />48 <br />amenity. Chair Maschka opined that this pioneering view was needed in Roseville, and <br />49 <br />reiterated his excitement for the project. Chair Maschka expressed his preference for modern <br />50 <br />design, while recognizing that this remained a concept at this time. <br />51 <br />52 <br />Member Quam advised that she had an opportunity to work with Sherman Associates over the <br />53 <br />last 10-15 years in private practice; and opined that their developments had proven <br />54 <br />phenomenal, from construction to management to practices, opining that they were a terrific <br /> <br />