My WebLink
|
Help
|
About
|
Sign Out
Home
2013_0819_packet
Roseville
>
City Council
>
City Council Meeting Packets
>
2013
>
2013_0819_packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2013 2:07:43 PM
Creation date
8/15/2013 3:49:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Bryan Lloyd <br />From:bthompson4654@comcast.net <br />Sent:Thursday, July 11, 2013 10:01 AM <br />To:Bryan Lloyd <br />Cc:hihchristianmontessori <br />Subject:HIH Christian Montessori Interim Port able Building Use at Corpus Christi <br />Hi Bryan ‐ <br /> <br />Thanks for taking my call this morning, as I mentioned I did hold a neighborhood meeting last night for the interim <br />classroom and (2) neighbors came ‐ Below is a summary of the meeting from last night ‐ 7pm July 10th, 2013. <br /> <br />Both neighbors that came live on the south side of the property line with the ch urch and pur chased their lots from the <br />church when it was developed back in 1992 I believe. <br />In discussing our need as a school for additional space with this use I believe is fine as they had very few questions and <br />had no concerns about the schools operations or the building and understood our nee ds and desire. <br /> <br />What they ha ve are very strong feelings with the church and the city for drainage issues they believe still exist on the <br />property line and discussed the background on this issue for the majority of the meeting and in closing inte nd to use this <br />opportunity to bring this issue up to the city again. They went as far to mention that they have been told the city has <br />allocated money for a project to improve the situation. <br /> <br />I did after the meeting go and look at all catch basins and the grad e tha t they have brought up. <br /> <br />As far as the portable goes one item I would like to discuss more either with you or the building official is placement of <br />the actual structure before the 7th of August. i.e setbacks from the building. Let me know when and how this would be <br />good timing to do. <br /> <br />Thanks again ‐ <br /> <br />Brent Thompson <br /> <br />Attachment B <br />Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.